Eolink 5 MW floating wind turbine gets Design Evaluation Conformity Statement by Bureau Veritas Eolink reaches a milestone with Bureau Veritas certification May 13th, 2022 Eolink has been granted Design Evaluation Conformity Statement by Bureau Veritas (BV), a leader...
EOLINK, along with 15 EU partners, kick starts the BLOW project, a pioneer floating offshore concept in low wind Black Sea Launch of the Black sea BLOW project (Floating Offshore Wind). January 18th, 2022 Engineering firm Eolink along with fifteen European renewable...
5 MW FOWT demonstrator to be tested at Centrale Nantes’ SEM-REV offshore The energy of the future unfolds at sea with Eolink and Centrale Nantes December 14th, 2020 On December 3rd, Eolink and Centrale Nantes formally agreed to install a 5 MW floating wind...
Eolink unveils its 5 MW FOWT demonstrator Eolink unveils its prototype, a pioneer of renewable energy. May 20th, 2020 Eolink pursues the scaling methodology already deployed at 1/10th. Here, the 5 MW demonstrator represents a 12 MW FOWT at 3/4th scale, or even a 16 MW...
OceanDEMO selection Eolink was recommended for support packages under the 2nd call by the Ocean DEMO Selection Board February 23th, 2020 Ocean DEMO Greenlights Three Floating Wind Projects Latest news Eolink receives support from Ademe to install a floating wind...