Industrial-1 GW

2030

TOWARD 35 €/MWh

Industrial production will lead Eolink to a 35 €/MWh LCoE, by 2030.

Eolink has the ambition to deliver 1 GW per year. To that extent, our company is already working on its wind turbine industrialisation. 1 GW plants should be installed in the new Marine Renewable docks that are being constructed, for example in Brest, France.

Each plant will be able to launch 67 turbines per year, that is to say 250 000 tons of steel. At each gigawatt launched, Eolink will provide 4.8 TWh additional renewable electricity to the grid.

Eolink will use 15 MW wind turbines or up to 20 MW, if the technology is made available at that time. With respect to the generator, it will be an industrial version of the internally designed generator.